Basic Info.
Product Description
Types Of Lawn Sprinklers,Underground 360 Garden Lawn Pop Up Popup Pop-Up Water Sprinkler Head
Item: MX705
Spec: G1/2" Femle
Nozzle Dia: 4.0mm
Press: 1.4-4.8Bar
Flux: 0.63-20.4m³ /h
Range(r): 2.5-9.1m
Product introduction:
This product is suitable for irrigation of green belt, flower bed, lawn, etc. Usually the nozzle is hidden in the grass. After opening, the center lifting column rises under the action of water pressure, the top nozzle is sprayed in a plane, and the water spray is evenly distributed. There are no dead ends in the spray range.
Product Details:
The plastic parts are made of high-strength anti-aging engineering plastics such as ABS and POM, and the lifting springs are made of stainless steel springs;
A filter net is installed inside the lifting column to prevent the nozzle from being clogged, and the nozzle and the filter net are convenient to be replaced;
The dirt on the lifting column can be quickly and automatically cleaned, which can adapt to the harsh field conditions and ensure the reliable operation of the nozzle;
The full circle and the fan-shaped spray are integrated, and the top fan shape is adjusted, and the operation is simple.
FAQ:
1. Are you factory or trade company ?
We are a factory for the garden irrigation tools many years, you could find our site on the google map follow our factory name.
2. Does the products made by yourself ?
Yes, we are the factory,we have the machine and the workingshop.you could get the working photos from us if you want.What you see and what you get.
3. Can we customize package with own logo on product?
Customized package is welcome, and we accept type the logo for you that need we discuss.
4. Do you supply sample? How much will you charge?
Yes, 1pcs free samples available, and you will need to pay shipping cost at first, when you place the order, we will refund the express charge to you.
5. How long will it take to receive samples?
We use the fastest express like TNT,DHL,FEDEX etc.,it will reach to your office about 4-5 working days.
6.Which one payments that you can accpet?How to pay?
T/T,L/C for the order.
7. How long will it take to manufacturer once an order has been placed?
It depends on qty and how to pack, normally 5-20 days, but really depend order details.